Tor Vergata Hospital
Roma

Project Description
Policlinico Tor Vergata, Rome was created from a desire to build a new type a new hospital model, characterized by a low number of beds, a high-tech and specialist approach capable of providing a comprehensive care pathawaywich includes:
- the ICU and the hospital with a high degree of short-term assistance (high-care)
- day hospitalization (day hospital) and low support-level hospitalization
- post-acute rehabilitation and integrated care with the family doctor.
Climater Interventions
Climater won the contract for installation, Operation, Manteinance of mechanical system (air conditioning, fire protection, water supply, water treatment, electrical, control and supervision) of:
- Operating Block B (BOB), 5 operating rooms High Surgery
- Department of Emergency and Acceptance (D.E.A) - Tc - RX
- Bunker Cyclotron and Radiotherapy (B.C.R.)
- Tower 8 and Tower 9
- Department hemodynamic Tower 6
- Areas Rustic (RMN-Gscan, depots and changing facilities)
- Tc Radiotherapy
- Ecm classroom
- Day surgery and day hospital
All utilities are controlled by a system of supervision, HVAC, Fire Alarm, Emergency Ventilation System, Security, transformer station.
Services
installation, Operation, Manteinance of mechanical system (air conditioning, fire protection, water supply, water treatment, electrical, control and supervision).
Interval
- Work start
- 9 November 2011